Email

Related Projects Worldwide

Quality Assurance and Inspection for Texas Transmission Lines Stanley Consultants was selected by Cross Texas Transmission, LLC, to provide inspection services for three 345 kV double circuit transmission lines and as owner’s engineer for two substations. Learn More
Powering Andersen Air Force Base Infrastructure As part of a multidisciplinary design team, Stanley Consultants was selected to perform electrical engineering design as the Electrical Engineer of Record for two primary locations on Andersen Air Force Base in Guam. Learn More
Several Services Were Provided to Complete this Complex 345 kV Center Red River Transmission Line Project for Minnkota Power Coop Stanley Consultants was hired to provide detailed design engineering, corridor and route selection, land acquisition, survey, project scheduling and controls, and construction management services to develop 260 miles of single-circuit 345 kV transmission line. Learn More
Successful Use of Engineer-Procure-Construct Helps Strengthen Nation's Power Grid When MidAmerican Energy required a new high-voltage transmission line to deliver electricity from the Council Bluffs Energy Center to a new substation in Grimes, Iowa, they relied on Stanley Consultants to design a sustainable solution for their needs. Learn More
Harris Substation – Providing Reliable Power to 2030 Stanley Consultants provided construction administration, feasibility studies, concept and detailed design for the University of Texas/Austin Harris Substation upgrade. This substation is the hub for the university’s gas-fired 120 MW Weaver Power Plant. Learn More

New Transmission Lines and Wind Projects in East Central North Dakota

Stanley Consultants was selected to provide detailed design and engineering; and construction services for this 61-mile 230 kV transmission line wind generation tie, switching station and existing substation.

Stanley Consultants provided preliminary transmission line modeling to support permit submittals, public meetings and to provide preliminary estimates and material bid specifications for procurement of long-lead-time equipment.  Once the route was selected, the detailed engineering packages were developed, including electrical, civil and structural packages, and provided construction contract support, including writing the RFP and evaluating construction bids.  During construction, line-staking services, on-call technical support, and full-time construction inspection were provided.

The project also included design and construction services support for the new 230 kV Pillsbury Substation.  In addition, the detailed design was completed for 9.5 miles of single-circuit 230 kV transmission line from a collector substation into the new Pillsbury substation.  These new transmission lines interconnect with several wind projects in east central North Dakota, and provide transfer of over 400 MW of wind-generated power.