HOV Bridges Hurdle Obstacles – Including Their Own Substructure A one-of-a-kind bridge design turned this HOV project into a showcase of engineering innovation and ingenuity. Learn More
Planning for a Safer Circle Interchange Stanley Consultants prepared a master plan study for safety related and aesthetic improvements on the aging Circle Interchange. Learn More
Idaho’s First SPUI – I-84 Vista Interchange As a key gateway between the Pacific Northwest and the Intermountain West, the I-84 Vista Interchange SPUI provides congestion-free travel to thousands of travelers daily. Learn More
Red Mountain Milestone – Power to University Segment Completes Loop 202 Completion of the 4.8-mile segment of Red Mountain Freeway, deemed "The Golden Spike of our Regional Freeway System," provides the critical link that completes a Phoenix freeway loop 20 years in the making. Learn More
I-15 Expansion Designed to Alleviate Headache and Traffic Congestion An aerial view of Utah’s Interstate 15 shows the spacious, multi-lane roadway. Learn More
Golden Gate Parkway is County’s First Single Point Interchange Stanley Consultants’ services were retained to provide design for the upgrade of the Golden Gate Parkway from a four-lane roadway to a six-lane urban divided roadway. Learn More
Fast-track Design of I-70 Reconstruction Interstate 70 out of Chicago had outlived its original design. Reconstruction was necessary to bring the highway up to current design standards, with improved safety features and a reduction in maintenance costs. Learn More
Crucial Interchange Completes Connection This multi-level directional urban traffic interchange alleviates congestion, reduces commute time, and provides access to the southern portion of the valley. Learn More

I-80 Widening Provides Motorists a Safer Route to the City

In 2007, the Illinois State Tollway completed the I-355 South Extension as a part of the IST Congestion Relief Program – Open Roads for a Faster Future. This effectively extended I-355 south 12.5 miles to Interstate I-80. The extension reduced local congestion in Will County and created direct access from Will County to the greater Chicagoland area.

In 2011, the Illinois Department of Transportation (IDOT) awarded Stanley Consultants a widening contract for an eight-mile section of I-80, four miles east and four miles west of the I-355/I-80 junction that was created in 2007. The completion of the I-355 extension created a significant rise in congestion on this section of I-80 as motorists could now use this route to travel to and from the city, as well as many of the surrounding suburbs. IDOT's intent in widening this section of roadway was to reduce the increased congestion and travel times to I-355.

Stanley Consultants provided Phase III engineering services on three separate construction contracts that included roadway widening, landscaping, signage, pavement markings, sewer work and noise barrier installation.