Fast-track Bridge Replacement

The theory behind Utah DOT’s (UDOT) accelerated bridge construction (ABC) program is that as the contracting community develops techniques and expertise in accelerated bridge construction, the additional costs of these alternative methods will decrease and road/bridge closure times will shrink, reducing the overall impact to the traveling public as compared to the more time-consuming methods of traditional bridge construction. ABC methods would then be determined by the right balance between construction costs and indirect costs such as user costs and improved safety.