Email

Related Projects Worldwide

De-Congesting Arizona’s Chino Valley Highway Stanley Consultants served as Arizona DOT’s prime design consultant to develop an innovative solution to the congestion and safety problem on SR 89. Learn More
Air Force Base Runway Replacement Supports Global War on Terrorism Stanley Consultants was retained by Perini Corporation as the lead design firm and coordinator throughout design, construction and closeout activities of the Andersen Air Force Base in Guam. Learn More
World’s Biggest Chiller Cools Qatar Island Stanley Consultants provided engineering design services for the world’s largest Integrated District Cooling plant, serving the needs of Qatar Island. The plant is also equipped with a desalination plant. Learn More
Water Main Hot Tap Critical to O’Hare Runway Project Stanley Consultants designed an innovative hot tap process resulting in no water service disruptions at O’Hare and savings of $80 million over next best design alternative. Learn More
Emissions Reductions Are Key in Power Plant Design Stanley Consultants served as owner’s engineer for City Utilities of Springfield, Missouri, 300 megawatt power plant, providing preliminary and detailed design of the entire plant which is equipped with state-of-the-art emissions reductions technology. Learn More
Transforming Fire-Damaged Landmark Into Popular Venue Through adaptive reuse, the fire-damaged Credit Island Lodge was reconstructed as an attractive public space. The structure’s historic look was retained, yet its functional value is far greater with public rental higher than before the fire. Learn More

Improving Baton Rouge’s Sewer System with New Wastewater Pump Stations

Stanley Consultants designed 16 new replacement pump stations for the City of Baton Rouge to resolve city-wide sewer problems and position the City to realize millions of dollars in fiscal savings through a 25-year planning period

For many years the City of Baton Rouge and East Baton Rouge Parish (C-P) have worked to resolve city-wide sewer problems.  Of primary concern is sanitary sewer overflow.  Excessive rain, groundwater in the collection lines, leaky manholes and undersized sewage pump stations have all led to the discharge of untreated sewage into the environment.  This discharge has compounded the major urban pollution problems that C-P is experiencing from non-point sources of runoff entering lakes, bayous, creeks and rivers.

To improve the quality of life for residents, as well as comply with federal mandates, the C-P has embarked on a parish-wide program which includes comprehensive rehabilitation projects, capacity improvement projects, and wastewater treatment and storage improvement projects. 

The C-P retained Stanley Consultants to design 16 new pump stations using submersible pumps to replace existing pumps stations that vary in size from 100 gpm to 20,000 gpm.  The three existing inline booster pump stations and 13 small duplex pump stations are being replaced with submersible pump stations that will have between 4 to 6 pumps.  The three larger stations will be modeled using computational fluid dynamics to ensure that the flow from the station meets the system demand.  Careful consideration is being given to how to switch the flow once the new stations are completed as all existing pump stations must remain in service during construction. 

These projects are expected to improve efficiencies, and position the C-P for millions of dollars in fiscal savings through a 25-year planning period.