Email

Related Projects Worldwide

Environmental Study Paving Way to Meet Future Traffic Volumes As part of a 12-mile study corridor, Stanley Consultants is conducting the environmental and engineering services required for Location and Design Concept Acceptance (LDCA) of the proposed improvements. Learn More
Helping a City Remediate a Contaminated Brownfield This contaminated Brownfield in Davenport, Iowa, fell victim to limited progress. The City of Davenport turned to Stanley Consultants to clean up the mess. In a short six weeks, the project had reignited and bid documents were ready to recruit companies for the cleanup efforts. Learn More
Restoring Salt River’s Ecosystem Working with the US Army Corps of Engineers, Stanley Consultants designed a plan to restore Arizona’s Salt River Pima Maricopa Indian Community lands to their natural beauty and wildlife habitat. Learn More
Industrial Development while Protecting an Endangered Species After performing mussel studies and assessments, Stanley Consultants devised a solution for an industrial client to move their riverfront facilities, while protecting the endangered mussels. Learn More
Retrofit, Switch or Shut Down – Complying with Future Boiler MACT Regulations Stanley Consultants is on the front line helping manufacturing companies prepare for new Boiler MACT Regulations that will have a significant impact on their bottom lines. Our expert staff obtains the knowledge need to help you reduce that impact; keep your production online and your facility in compliance. Learn More

Providing Reservoir Storage for Restoration of the Florida Everglades

Stanley Consultants designed the C-43 Basin West Storage Reservoir to provide storage for the Caloosahatchee River basin in support of the South Florida Water Management District’s participation in the Comprehensive Everglades Restoration Plan (CERP).

The C-43 Basin West Storage Reservoir is part of a project to provide reservoir storage for the entire Caloosahatchee River basin as part of the Comprehensive Everglades Restoration Plan (CERP).  The purpose of the project as defined in the CERP was to capture C-43 Basin high flows due to runoff and releases from Lake Okeechobee.

Stanley Consultants provided alternative evaluations, test cell design, monitoring and analysis, final design, bidding and construction services.  The goal of the West Storage Reservoir was to provide 170,000 acre-feet of storage.

Our team was also responsible for implementing the South Florida Water Management District standard design drawings in preparation for design of seven gated structures, two emergency overflow structures, two reservoir discharge structures, and one 1,500 cfs pump station for a 160,000-acre-foot dual cell storage reservoir system.

On a design review for the C-43 project, the District Project Manager said of Stanley Consultants: "Well qualified staff, very flexible in modifying to meet SFWMD Goals."