Conroe Army Reserve Center

Client:

U.S. Army Reserve

Project Type:

Engineering & Design

Location:

Conroe, Texas

Picture of Solar Panels and Windmills

About the Project

Texas base installs combo renewable and gas-fired microgrid

Stanley Consultants is designing an $8.1 million, 750-kV smart microgrid for the Conroe Army Reserve Center in Conroe, Texas. The microgrid, using renewable and back-up battery storage and natural gas generation, will provide energy resilience for at least 14 days to mission-critical operations. Along with developing deliverables for the utility interconnection agreement, Stanley Consultants developed and specified requirements for master microgrid controls, automated distribution switching with the utility, low-voltage switchgear, solar photovoltaic panels, mounts, inverters, transformers, controls and communication, AC/DC wiring with conduit, low voltage switchgear and cyber security.

By The Numbers

  • $8.1 million

    Project cost

  • 750-kV

    Circuit breakers

Solutions

Asset Management

Asset management is built into everything Stanley Consultants does when planning, modeling, designing and evaluating public and private infrastructure projects.

Engineering & Design

Engineering and design services at Stanley Consultants combine our robust technical skills with forward-thinking innovation to deliver the highest-quality results.

Strategic Planning & Consulting

At Stanley Consultants, we understand that planning and consulting include every aspect of engineering. We use the best tools available to create designs and master plans built for longevity, resiliency, and sustainability.

Work With Our Team of Experts on Your Project Today

Get In Touch