Email

Iowa

Cedar Rapids
118 Third Avenue SE
Suite 430
Cedar Rapids, Iowa 52401
Phone: 319.432.6910

Iowa City
Established: November 1, 1995
University of Iowa 
Oakdale Research Park
2658 Crosspark Road, Suite 100
Coralville, Iowa 52241
Phone: 319.626.3990
Fax: 319.626.3993 

Des Moines
Established January 1, 1990
100 Court Avenue, Suite 300
Des Moines, Iowa 50309
Phone: 515.246.8585
Fax: 515.246.8617

Muscatine (Corporate Headquarters)
Established September 1, 1913
225 Iowa Avenue
Muscatine, Iowa 52761
Phone: 563.264.6600
Fax: 563.264.6658

Iowa Project Experience

Successful Use of Engineer-Procure-Construct Helps Strengthen Nation's Power Grid
When MidAmerican Energy required a new high-voltage transmission line to deliver electricity from the Council Bluffs Energy Center to a new substation in Grimes, Iowa, they relied on Stanley Consultants to design a sustainable solution for their needs.
Learn More
Combining Heat, Cooling and Power into One Facility
The University of Iowa’s Research Park is the fastest growing campus at the University. To support this continued growth, the University needed a robust utility infrastructure to support existing and future utility loads.
Learn More
College Additions Designed to Meet LEED® Silver
Clinton Community College, Science and technology Lab #4 – Stanley Consultants provided civil, structural, mechanical, electrical, and construction administration services for three new science and technology additions for the Eastern Iowa Community College District.
Learn More
EPA Compliance Reached Through Fort Madison CSO Project
The U.S. Environmental Protection Agency issued a Consent Order requiring the City of Fort Madison to address combined sewer overflows (CSOs) by either implementing disinfection of CSOs or eliminating them.
Learn More
Westside Diversion Tunnel = Economic Growth for the Quad Cities
This unique view of the Davenport Westside Diversion Tunnel project captures the girth of the new sewer line. The project has resolved the sewer problems and indirectly enhanced the City’s economic base. The water environment in the Mississippi River and the habitat for local wildlife, waterfowl, and fish has significantly improved.
Learn More
Operations-Friendly Facilities Address Current and Future Wastewater Challenges
The $26.5 million expansion at Iowa City’s south wastewater treatment plant doubled its capacity from 5 MGD to 10 MGD.
Learn More
Building Commissioning Helps Facility Maintain its Sustainability
Stanley Consultants provided enhanced commissioning services for the National Guard’s Readiness Center in Iowa City, IA. The center, also designed by Stanley Consultants, meets the requirements set by the U.S. Green Building Council for the Leadership in Energy and Environmental Design (LEED) Silver Rating.
Learn More
Birdland Levee Provides Flood Control and Recreation
Made necessary by damage incurred during the 1993 floods, the Birdland Levee Improvements Study and Design included improvements for 8,000 feet levee along the northeast bank of the Des Moines River.
Learn More
Pedestrian Bridge is Signature Landmark
Stanley Consultants provided construction administration and construction observation for the Center Street Pedestrian Bridge in Des Moines, IA. The bridge is a key component in the city’s Principal Riverwalk, which features lighted landscaped public spaces, world-class public art and this unique pedestrian bridge with pathways that connect 300 miles of central Iowa trails.
Learn More
Incorporating History is No Challenge in Bridge Design
Stanley Consultants provided structural engineering, electrical engineering design, and construction administration and observation for the rehabilitation of the old Union Railroad Bridge across the Des Moines River in downtown Des Moines, Iowa.
Learn More
No More (Radium) Trouble in River City
Mason City is home to the third largest electrodialysis reversal (EDR) technology system in the world.
Learn More
Modern Woodmen Park Flood Protection
The removable floodwall protects the baseball stadium from flooding and keeps ball in play.
Learn More

Recent News

Thomopulos Appointed to Institute for Sustainable Infrastructure Board

May 4, 2015 | The American Council of Engineering Companies (ACEC) has appointed Gregs G. Thomopulos, P.E., Chairman of Stanley Consultants, to the Institute of Sustainable Infrastructure (ISI) board of directors for a three-year term.

West Side Diversion Tunnel Wins ACEC National Honor Award

April 28, 2015 | Stanley Consultants received an Engineering Excellence Honor Award from the American Council of Engineering Companies (ACEC) for the design of the West Side Diversion Tunnel in Davenport, Iowa. 

Hoague Joins Stanley Consultants as Project Principal

February 28, 2015 | Mark R. Hoague, P.E., has joined Stanley Consultants as a project principal supporting the company's Federal Market.

Stanley Consultants Celebrates Introduce a Girl to Engineering Day

February 26th, 2015 | Gayle Roberts, Stanley Consultants CEO, shares with 8th grade girls the top 10 reasons why she love engineering.

Stanley Consultants and Premier Engineering Establish Mentor/Protégé Relationship

January 26, 2015 | Stanley Consultants and Premier Engineering Corporation have recently partnered to form a mentor/protégé relationship.

Stanley Consultants Designing Renovation of Fort Madison Wasterwater Treatment Plant

December 23, 2014 | The Fort Madison, Iowa, wastewater treatment plant is poised to undergo an extensive renovation that will improve its overall reliability and efficiency, as well as help protect it from flooding. The renovation is currently under design by Stanley Consultants.

Stanley Consultants Receives Blue Zone Worksite Designation

October 31, 2014 | Stanley Consultants has successfully achieved a Blue Zones Worksite designation. This accomplishment means that Stanley Consultants has demonstrated a commitment to the wellbeing of its employees by creating a healthier work environment that supports environmental, social, and policy changes that promote healthier behaviors.

Stanley Consultants Selected for Flood Mitigation Project

October 27, 2014 | To mitigate flooding caused by the Cedar River, the City of Cedar Rapids has selected Stanley Consultants to provide design services for the East Side Cedar Rapids Flood Mitigation System, and to provide program management services for the comprehensive flood mitigation plan for both sides of the river.

Ford Joins Stanley Consultants as Senior Landscape Architect

October 10, 2014 | Steve Ford has joined Stanley Consultants as a Senior Landscape Architect. Based in the company’s Iowa City Office, Ford serves as the local design professional for Stanley Consultants’ Denver-based Urban Design team.

Engelke Joins Stanley Consultants as Chief Financial Officer

August 20, 2014 | Travis Engelke has joined Stanley Consultants as Chief Financial Officer and Vice President.

Stanley Consultants and Alberici Constructors Awarded Major Air Quality Control Project

July 23, 2014 | A joint venture of Stanley Consultants and Alberici Constructors has been awarded a contract to engineer, procure and construct (EPC Contract) a major air quality improvement project at the Edgewater Generating Station Unit 5 in Sheboygan, WI that is owned and operated by Alliant Energy’s Wisconsin utility, Wisconsin Power and Light Company.

Hartford Joins Stanley Consultants as Federal Project Principal

July 18, 2014 | Scott Hartford, P.E., has joined Stanley Consultants, a global consulting engineering firm, as a Project Principal in the company’s Federal Business Unit. Based in the company’s Austin, Texas office, he will be responsible for business development, client relations and project oversight for federal clientele.

Top