I-86, I-15 Wye OPass System Interchange
Client:
Idaho Transportation Department
Project Type:
Engineering & Design
Location:
Idaho
About the Project
ITD Enhances Safety by Reducing Ramp Speed, Solving Geometric Challenges
Stanley Consultants provided a value planning study for Idaho Transporation Department (ITD) to support programming and pre-design activities for this system-to-system interchange project. During the study it became apparent that the overwhelming project driver was to enhance safety. The idea was proposed to reduce the directional ramp speed by 5 mph. This allowed for improvements to stay within the existing right of way, allowed new alignment to match existing curve geometrics and simplified phased construction. ITD was able to save $20- to $25 million from an otherwise $81 million project by reducing the ramp speed.
By The Numbers
-
20
Million Dollars Saved
-
81
Million Dollars in Construction and Right-of-Way
Solutions
Engineering & Design
Engineering and design services at Stanley Consultants combine our robust technical skills with forward-thinking innovation to deliver the highest-quality results.
More Projects