Powering Andersen Air Force Base Infrastructure
As part of a multidisciplinary design team, Stanley Consultants was selected to perform electrical engineering design as the Electrical Engineer of Record for two primary locations on Andersen Air Force Base in Guam.
This two-location project includes electrical, telecommunications, and security system designs for site infrastructure and several small site buildings, including a welcome center and entry control point facilities, over watch facilities, and vehicle inspection area.
Apra Harbor – This project consists of a multi-phase electrical design package for a photovoltaic array at the welcome center, three additional pump stations, utility building, security lighting and compressed air and steam plant.
Aviation Combat Element Gate – This electrical package consists of relocating existing fiber-optic cable, installing electrical conduit stub-outs, detailed electrical, telecommunications and security plans for entry control facilities; and roadway lighting.