Skip to main content

Carrollton Water Treatment Plant

Client:

Sewerage & Water Board’s Carrollton Water Treatment Plant

Project Type:

Engineering & Design

Location:

New Orleans

About the Project

Engineers alleviate water issues related to hurricanes in New Orleans

Stanley Consultants is providing design and construction, engineering and inspection services for the ongoing Water Hammer Hazard Mitigation Project at the Sewerage & Water Board’s Carrollton Water Treatment Plant. The station was 65-years old with 1,500- to 2,250 horsepower pumps that manually started. The station had an unreliable power source and was experiencing surge damages to the distribution system. Scope of work includes the replacement of four 44-million-gallons per day (MGD) pumps at the Claiborne Pump Station and two 45-MGD pumps at Panola Pump Station, for a total of six new 45-MGD variable-speed pumps with 60-cycle motors. In addition, there will be the installation of two new 45-MGD variable-speed pumps with 60-cycle motors at the low lift station within the power plant along with the installation of slow opening and closing valves with battery backup for each.

By The Numbers

  • 6

    New 45-MGD Pumps

  • 2

    45 MGD Pumps

Solutions

Engineering & Design

Engineering and design services at Stanley Consultants combine our robust technical skills with forward-thinking innovation to deliver the highest-quality results.

Environmental & Regulatory

At Stanley Consultants, our talented team of scientists and engineers is focused on helping clients adapt to evolving regulations and finding solutions to protect the changing environment.

Work With Our Team of Experts on Your Project Today

Get In Touch